Construction gallery

From the Jobsite

See where work began, what was removed, and what was built. Each photograph identifies its construction stage.

Progress sequences

Grid of reinforcing bars in a square footing excavation.Overhead view of concrete footings and isolated pads on a wooded site.Concrete block foundation walls around the footprint of the building.September–October 2022 · 7 photographs

A foundation taking shape

Seven views of the same site follow the trenches, the reinforcing steel, the pour and the blockwork that rises above it.

Exposed rows of wood deck joists inside a timber guardrail.New wood decking beside the house and the same perimeter guardrail.June 16–20, 2022 · 2 photographs

One deck, four days apart

The same perimeter railing appears in both photographs. On June 16 the joists are exposed. By June 20 the deck boards cover them.