Illustration: two proposals, one project, and the page that lets you compare them.
Two proposals for the same project rarely describe the same project. Each builder fills the gaps in your information with assumptions, and no two builders make the same ones. So before you compare the totals, compare what each total is buying.
The Federal Trade Commission's advice on estimates is short: do not automatically choose the lowest bidder, and ask for an explanation if there is a big difference among the estimates. Here are seven places to look for that explanation.
1. The scope
Start with what work is in the price. Go line by line through the parts of a project that sit outside the walls: clearing and grading, the driveway, utility connections, a septic system or a well, permits and fees, landscaping, appliances, final cleaning. One proposal may include an item, a second may list it as the owner's, and a third may say nothing at all.
Silence is not inclusion. If a proposal does not mention something, ask, and get the answer in writing.
Illustration: one proposal lists an item and the other leaves it out. Silence is not inclusion.
2. The drawings it was priced from
A proposal should say which drawings it priced, and which version. If one builder priced the first sketches and another priced the revised plans, the two totals describe two different buildings. The same goes for a written outline of materials and finishes: either both builders had it, or the comparison is off before it starts.
3. The allowances
An allowance is a placeholder amount for something you have not chosen yet, such as flooring, light fixtures or cabinets. Allowances are normal. They are also one of the simplest ways for two totals to drift apart, because a lower placeholder makes a lower total without making a cheaper house.
List the allowances from each proposal side by side: what each one covers, and the amount. Then ask yourself whether the amount would buy the thing you have in mind. If it would not, the difference is still yours to pay. It just arrives later.
4. The exclusions and assumptions
Read the exclusions before the total. They tell you what the builder decided not to guess at: rock or poor soil, conditions hidden inside an old house, engineering, fees charged by a town or a utility.
Then look at how each proposal treats the unknown. One may state an assumption. One may give a price per unit if the problem appears. One may not mention it. The three totals can look alike on signing day and behave very differently after that.
5. The kind of price
A fixed price and an estimate of costs plus a fee are not the same kind of number. The first is a commitment for a defined amount of work. The second is a forecast. Neither is wrong, but setting one beside the other and picking the smaller figure compares a promise with a prediction.
We covered the three kinds of numbers a builder can give you, and when each is possible, in What to Decide Before Asking for a Construction Price.
6. What is written down
The FTC says a written estimate should include a description of the work to be done, the materials, the completion date and the price. For home improvement work, the North Carolina Department of Justice says to get a written contract that covers all of the work, the quality of the materials, the total price for labor and materials, any warranties or guarantees, the start and finish dates, and who handles clean-up and trash removal.
That makes a usable checklist. Hold each proposal against it. A proposal that leaves one of those out is not cheaper. It is unfinished.
7. Who is offering it
A price is only as good as the company that has to stand behind it. The Department of Justice advises checking the contractor's license before you hire, and asking for the contractor's insurance policy or bond, then confirming the coverage with the insurer yourself.
The state licensing board says state law requires a licensed general contractor once a project's total cost reaches $40,000, and its website has a license search. Check every name on your list the same way, ours included.
Putting them side by side
Make one page with a column for each builder and a row for each item above: scope, drawings priced, allowances, exclusions, kind of price, dates, license and insurance. Fill in what the proposals say. Where a box is empty, ask that builder to fill it in writing.
Illustration: one page, a column for each builder and a row for each item. An empty box is a question to ask in writing.
Only then compare the totals. If the gap has an ordinary explanation, it is sitting in one of the rows. The lowest number on the page is sometimes just the shortest list.
One more thing makes all of this easier: give every builder the same information at the start. The same drawings, the same outline of finishes, the same dates. It will not make the proposals identical, but it makes the differences mean something.
Where we fit
We design and build in Moore County. If you are gathering prices for a house, an addition or a remodel here, send us what you are giving everyone else: the town or parcel address, any drawings or photos, a budget range and a target start date. If some of that is undecided, say so.
Related: Planning a custom home in Moore County · Construction
This article is general information, not legal or financial advice. Sources checked November 12, 2026.
Sources
Federal Trade Commission, How To Avoid a Home Improvement Scam
NC Department of Justice, Home Improvement