Permits in Moore County: Who Issues What

Map: town limits in Moore County. Pinehurst, Southern Pines and Aberdeen, in red, each run their own building permits and inspections. Boundaries from the U.S. Census Bureau.

A Moore County mailing address does not tell you who issues your building permit. Pinehurst, Southern Pines and Aberdeen each run their own building permits and inspections, and the county runs its own. Which office is yours depends on where the parcel sits. Here is what each one says about itself.

Pinehurst

The Village's Building Inspections division says it reviews and enforces the state building codes and local regulations for all residential and commercial construction within the Village limits and its extra-territorial jurisdiction, an area outside the limits that the Village also regulates. Applications go through the Village's online Permit Center.

Two things on that page are worth knowing early. For a new single-family house, an addition, a swimming pool or an accessory building, the Village requires a survey prepared by a licensed surveyor or engineer. And in the local historic district, most exterior changes need approval first.

Southern Pines

Building permits and inspections belong to the Town's Community Development Department. Its residential permit packet lists what goes in with the application:

  • Plans. One set of building plans, and a site plan showing the setbacks from all property lines.

  • An address. Proof of the address assigned by Moore County, if the lot does not have one yet.

  • The driveway. A completed form for construction on the Town right-of-way.

  • Water and sewer. The Town's service application, or the county's septic approval.

  • Historic District. A certificate of appropriateness, if the property is inside it.

The packet also says that approval of the driveway, erosion control and water and sewer service, or proof of septic approval, must be received before the building permit is issued. One permit, several approvals behind it.

Aberdeen

The Town's Planning and Inspections page splits the work in two. The Planning Department processes zoning permits. The Inspections Department enforces the state building code throughout the Town's jurisdiction and issues building permits. Building permit applications are made online.

The county

Moore County's Planning and Inspections department, in Carthage, has its own residential permit application for site-built homes, modular homes, additions, renovations and accessory buildings. Its checklist, revised in December 2024, asks for one set of floor plans and a copy of the recorded deed, and says a survey may also be required.

The checklist also says a zoning permit may be required, and lists phone numbers for the county and for seven towns: Cameron, Carthage, Foxfire, Robbins, Taylortown, Vass and Whispering Pines. It does not explain the list. If your parcel is in or near one of those towns, call that number before the drawings go far.

Where septic comes in

For a new septic system, the county checklist asks for an improvement permit from Moore County Environmental Health. The Southern Pines packet points to the county for septic approval too.

An existing system can come into it as well. The county checklist says a recertification permit or an affidavit may be required for an addition that extends outside the existing foundation, for an interior renovation that adds bedrooms, and for items such as decks, pools, storage buildings and driveways.

Map: Pinehurst, Southern Pines and Aberdeen up close. The town limits are ragged and leave pockets that sit outside all three, so the parcel number settles what a mailing address cannot. Boundaries, streets and lakes from the U.S. Census Bureau.

Find out which office is yours first

Town limits do not follow mailing addresses, and a town's rules can reach past its limits. So before design goes far, ask the planning office you believe is yours to confirm it, with the parcel number in hand. The post office and the permit office do not consult each other.

Two limits on this piece. It reports what these four offices publish, as read on November 12, 2026, and those pages change. And none of this covers a neighborhood's own design review, which is separate from any permit.

What happens after the permit is issued is in the inspections a new house goes through, in order. What to check before you own the lot is in build constraints to check before you buy. Planning to build, add on or remodel in Moore County? Tell us where the property is and what you have so far.

Next
Next

What to Decide Before Asking for a Construction Price